Cast Iron V Belt Pulley

Product Details
Customization: Available
Certification: CE, ISO
Pulley Sizes: Type A
Still deciding? Get samples of US$ 0.5/Piece
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (10)
  • Cast Iron V Belt Pulley
  • Cast Iron V Belt Pulley
  • Cast Iron V Belt Pulley
  • Cast Iron V Belt Pulley
  • Cast Iron V Belt Pulley
  • Cast Iron V Belt Pulley
Find Similar Products

Basic Info.

Model NO.
SPZ, SPA, SPB
Manufacturing Process
Casting
Material
Iron
Surface Treatment
Phosphating
Application
Chemical Industry, Grain Transport, Mining Transport, Power Plant
Transport Package
Poly-Wooden Carton
Specification
SPZ, SPA, SPB, SPC, A, B, C, D, 3V, 5V 8V
Trademark
GPBELT/SKYLINE
Origin
China
HS Code
84390000
Production Capacity
5000PCS/Day

Product Description

V-BELT  PULLEY

V-Belt Pulleys are all manufactured according to ISO 4183 and DIN 2211 norms. The material used for the construction of these pulleys is cast iron

GG25 and after the machining all pulleys will be phosphated. Each pulley is stricly Dynamically balanced with high precision dynamical balancing

maching tools. Unbalanced volume will be corrected accurately. 


SPZ-SPA-SPB-SPC Series
 
 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley






3V-5V-8V SERIES

 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley




 AK, AKH, BK, BKH SERIES FOR 3L-4L-A-B V BELT

 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley



A-B-C-D SERIES IN GB NORM & INCH SYSTEM
 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley




WORKSHOP & MACHINERY
 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley



PACKING & DELIVERY 

 
Cast Iron V Belt Pulley
Cast Iron V Belt Pulley





FAQ

1. Can I get any sample ? 
Samples are free to be available, if there is any in stock. But you have to absorb the relative courier fee.


2. How long is the delivery time for the production?
Production lead time is 30-60 days for the production.

3. What's your advantage?
Competitive price, good quality, high-experience engineers abailable, professional service.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier